Planning applications in Caerphilly

Wales, Wales

10,437 applications since 2016. 6,901 approved and 1,575 refused.

Last updated 8 November 2026.

By project

ProjectApplicationsApprovedRefused
Rear extensions 2,163 1,722 331
Side extensions 1,326 983 241
Front extensions and porches 562 385 137
Loft conversions and dormers 559 396 107
Garden rooms and outbuildings 1,680 1,180 296
Solar panels 79 46 4
Windows and doors 549 393 67
Fences, walls and gates 316 169 67
Driveways and dropped kerbs 283 149 44

Planning in Caerphilly

Caerphilly decides most householder applications within eight weeks. The median decision took 7.3 weeks across 2023 to 2025, and more than eight in ten were decided within 8 weeks. That is a real advantage if you are working to a deadline.

The trade-off is a stricter record. Of 10,373 applications since 2016, about 1 in 5 decided applications was refused, compared with about 1 in 7 across the areas we cover. Rear extensions, the biggest category with more than 2,000 applications, are refused about 1 in 6 times, slightly better than Caerphilly’s average but worse than the national rate. Garden rooms and outbuildings and side extensions are each refused about 1 in 5 times.

Several projects stand out as difficult. Front extensions and porches, fences, walls and gates, and driveways and dropped kerbs are each refused about 1 in 4 times, all above the local average. Loft conversions and dormers are refused about 1 in 5 times, the same as the national rate. Windows and doors are the easier end of the range at about 1 in 7, although that is still more often than the national 1 in 9. Solar panels are refused only about 1 in 12 times, better than the national 1 in 9.

For anyone seeking planning permission in Caerphilly, the practical message is to look hard at what has been approved on nearby streets before you submit. With so many project types refused around 1 in 4 or 1 in 5 times, a design that follows approved local examples is the safer starting point.

The pattern has been stable. Caerphilly received 850 applications in 2025, against an average of 900 a year in the three years before, and about 1 in 4 was refused in both periods. The busiest year was 2021, with 1,165 applications.

Figures in this section as of 9 October 2026.

Architects and agents, last 5 years

FirmApprovedDecided
Penrose Architectural Services4755
Skerryvore Designs2542
CLC Construction Consultants Ltd2232
Williams Architectural Design1934
K J Lloyd Architect1827
Creation Design Wales1826
Brennan Architectural Design1722
aj tech design1618
Asbri Planning Ltd.1617
LRM Planning Ltd.1515

Year by year

YearApplicationsApprovedRefused
202670930696
2025850512156
2024896559177
2023825544150
2022979628223
20211,165755232
2020999671166
201994869081
20181,016735106
20171,02478089
20161,02672199

Protections

Conservation areasNot published
Listed buildingsNot published
Article 4 directions None found