Solar panels in Gedling

All of Gedling

51 applications since 2016. 38 approved and 2 refused. Refused: about 1 in 20 here, about 1 in 10 across the councils we cover.

Last updated 9 November 2026.

Without planning permission

  • On a pitched roof, no more than 0.2 m proud of the slope and no higher than the highest part of the roof, chimneys aside
  • On a flat roof, no more than 0.6 m above the highest part of the roof, chimneys aside
  • On a wall, no more than 0.2 m out if it abuts a road, 0.4 m otherwise
  • Not on a listed house
  • Plug-in panels not on a wooden wall or timber cladding
  • Sited to keep the effect on the look of the house and the area as small as possible

England, houses only. Flats, listed buildings, conservation areas and Article 4 directions change this. The full rules.

Year by year

YearApplicationsApprovedRefused
2026500
2025750
2024651
202311110
202213110
2021210
2019110
2018311
2017110
2016220

Neighbouring councils

CouncilApprovedRefusedHow often
Ashfield 56 4 about 1 in 15
Newark and Sherwood 104 19 about 1 in 6
Nottingham 76 1 about 1 in 77
Rushcliffe 150 13 about 1 in 13

Other projects in Gedling