Solar panels in Kirklees
209 applications since 2020. 159 approved and 15 refused. Refused: about 1 in 12 here, about 1 in 10 across the councils we cover.
Last updated 9 November 2026.
Without planning permission
- On a pitched roof, no more than 0.2 m proud of the slope and no higher than the highest part of the roof, chimneys aside
- On a flat roof, no more than 0.6 m above the highest part of the roof, chimneys aside
- On a wall, no more than 0.2 m out if it abuts a road, 0.4 m otherwise
- Not on a listed house
- Plug-in panels not on a wooden wall or timber cladding
- Sited to keep the effect on the look of the house and the area as small as possible
England, houses only. Flats, listed buildings, conservation areas and Article 4 directions change this. The full rules.
Year by year
| Year | Applications | Approved | Refused |
|---|---|---|---|
| 2026 | 52 | 27 | 4 |
| 2025 | 41 | 37 | 1 |
| 2024 | 37 | 30 | 5 |
| 2023 | 40 | 32 | 2 |
| 2022 | 27 | 24 | 1 |
| 2021 | 7 | 4 | 2 |
| 2020 | 5 | 5 | 0 |
Neighbouring councils
| Council | Approved | Refused | How often |
|---|---|---|---|
| Barnsley | 142 | 10 | about 1 in 15 |
| Calderdale | 88 | 22 | about 1 in 5 |
| Leeds | 514 | 78 | about 1 in 8 |
| Oldham | 38 | 2 | about 1 in 20 |
| Peak District | 116 | 28 | about 1 in 5 |
| Wakefield | 104 | 14 | about 1 in 8 |