Solar panels in Snowdonia

All of Snowdonia

69 applications since 2020. 58 approved and 3 refused. Refused: about 1 in 20 here, about 1 in 10 across the councils we cover.

Last updated 8 November 2026.

Without planning permission

  • On a pitched roof, no more than 0.2 m proud of the slope and no higher than the highest part of the roof, chimneys aside
  • On a flat roof, no more than 0.6 m above the highest part of the roof, chimneys aside
  • On a wall, no more than 0.2 m out if it abuts a road, 0.4 m otherwise
  • Not on a listed house
  • Plug-in panels not on a wooden wall or timber cladding
  • Sited to keep the effect on the look of the house and the area as small as possible

England, houses only. Flats, listed buildings, conservation areas and Article 4 directions change this. The full rules.

Year by year

YearApplicationsApprovedRefused
2026960
202522190
202414122
202316150
2022651
2021100
2020110

Other projects in Snowdonia